Skip to content

Releases

HADAL ships a stable release every Friday. Between two Fridays, the next release comes out as betas that people can choose to run.

When What happens
Friday, after a release The branch of the next release opens: release/X.Y.0, from main.
Saturday to Thursday Ready pull requests merge into the release branch. A beta comes out when something worth trying lands.
Thursday, end of day Code freeze: from now on, only fixes go into the release branch. The last beta comes out.
Friday The review and live-test rounds run on the release branch, and their fixes go in. Then the release pull request merges into main, and the tag vX.Y.0 and the GitHub release publish it. The release workflow also puts it on npm as @t-crypt/hadal.

A week with nothing to ship has no release. A change that is not ready by the freeze waits for the next week.

A release is the tag and the GitHub release, and the app reads both to offer an update. Publishing a release also runs .github/workflows/publish.yml, which puts the package on npm as @t-crypt/hadal; it needs the NPM_TOKEN secret, and a version with a pre-release part goes to npm’s beta dist-tag, never to latest. The first release is v0.29.0, 2026-11-17: it is a GitHub release only, so an npm install takes the release after it.

  • A weekly release is a minor version: 0.26.0, then 0.27.0. HADAL is before 1.0, so a minor version can also change behavior. The notes say so.
  • A beta is the next release with a number: 0.27.0-beta.1, 0.27.0-beta.2. Its commit is “Version 0.27.0-beta.N”, and only package.json and package-lock.json change in it.
  • A fix that cannot wait for Friday is a patch release (0.27.1), from the last release’s tag, on any day. It goes into the open release branch too.
  • Open pull requests against hadal. A maintainer merges a ready one into the open release branch, with a merge commit that names the pull request and its author: Merge PR #186: … (@Haichiu). Your commits keep your name.
  • A maintainer’s follow-up commits on a pull request name it too: “Follow-up to PR #186 by @Haichiu”.
  • GitHub marks the pull request merged when the release branch merges into hadal.
  1. On the release branch, set the version: npm version 0.27.0-beta.1 --no-git-tag-version, then commit “Version 0.27.0-beta.1”.
  2. Run npm run check, npm run lint, and npm test.
  3. Push the branch and the tag v0.27.0-beta.1.
  4. Make a GitHub release from the tag and mark it as a pre-release. Its notes are short: what is new since the last beta, with credits, written as release-notes.md says.
  5. A version with a pre-release part (-beta.N) is marked as a pre-release on GitHub, so people who do not choose betas never get it.

A pre-release on GitHub is not the repository’s latest release, and the version tag of a beta is not a release tag for updates. So people who do not choose betas never get one.

  • From the app: turn on Beta updates in Menu → Extensions → Installed → HADAL updates (since 0.27.0). Menu → Update HADAL then offers betas too, marked Beta. Turn it off to wait for the next stable release: the app never offers an older version. With Install new versions by themselves on too, betas install by themselves.
  • A global npm install: npm install -g @t-crypt/hadal@beta. Go back with npm install -g @t-crypt/hadal@latest.
  • A git checkout: git checkout v0.27.0-beta.1, then npm install.

A beta is tested less than a release. Back up ~/.hadal before you run one: a beta can change stored data one way, and then the version before it cannot read the data.

These pages describe HADAL 0.29.0. Your copy has the pages of its own version in its docs/ folder.